19.07.2022
Success right down the line: LISTA for VBZ
The historic tram depot of Verkehrsbetriebe Zürich (VBZ) in Zurich-Oerlikon was extensively renovated over three years. The result is modern industrial architecture par excellence: state-of-the-art energy efficiency, construction and operation. We are therefore particularly pleased to be represented inside the depot with a whole range of individually configured storage and workspace equipment.
The project includes the complete mobile shelving system, drawer storage walls, a workbench based on drawer cabinets as well as a height-adjustable C-table from the versatile LISTA workstation system. In short: a tailor-made solution for smooth workflows, as is familiar from LISTA.